IMPELLER,DWG.666-1627,FOR PP-203B

Material 4300058470 · IMPELLER · Plant 1000

SReducePotentially obsolete
Material
4300058470
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~184 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 5 exceeds the level to keep (0) by 5.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 484,538/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~105 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PP-203B
DEMIN WATER PUMP
S172.76

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Aug 2026MediumPY_PP-203BOverhaul PP-203B
14 Aug 2026MediumPY_PP-203BPP-203B high vibration
09 Jul 2026MediumPY_PP-203BPainting PP-203B
17 Feb 2026MediumPY_PP-203B[MSI-B-26-FRN-294/M] Replace line
02 Dec 2025MediumPY_PP-203BReplace lamp as per PM finding
31 Oct 2025LowPY_PP-203B[MSI-B-25-HVK-154/M] Replace line
11 Jun 2025LowPY_PP-203BPP-203B seal leak

Recent goods issues

Never issued in the 17-month history.