SPRING,SAFETY VALVE,DWG.745-2229,FOR PRV

Material 4300058479 · SPRING · Plant 1000

SSafety-criticalReorderCriticalStockout
Material
4300058479
Category
SPRING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
137 d · P80 196 d
Unit price
Rp 8.8M (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~137 days; expected demand during lead time 0.7.
  • 4.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
Proposed purchase requisition
8 EA
Rp 70.5M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
8
order qty 3
Service level
99.7%
stockout risk now 24%
Unit price
Rp 8.8M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 285 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-761
SAFETY VALVE PP-1011D
S120.90

Lead time and procurement

Lead time 137 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_PRV-761Recertification PRV-761
15 Jun 2025MediumPX_PRV-761Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
20 Dec 20251201000030487Corrective
19 Dec 20254201000030487Corrective