NOZZLE,SAFETY VALVE,DWG.756-9179,FOR PRV
Material 4300058925 · NOZZLE · Plant 1000
SSafety-criticalLong-leadReduceExcess
- Material
- 4300058925
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 130 d · P80 177 d
- Unit price
- Rp 36.2M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~130 days; expected demand during lead time 0.6.
- 4.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 5.Stock 18 exceeds the level to keep (5) by 13.
- 6.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
18 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.4%
stockout risk now 0%
Unit price
Rp 36.2M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 83 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1319D SAFETY VALVE HE-1277C | S | 1 | 3 | 0.90 |
Lead time and procurement
Lead time 130 ± 50 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Jan 2026 | PR03 Regular replenishment | 1 | Rp 37.1M | 18 Jul 2026 | 191 d |
| 08 Jul 2025 | PR06 Regular replenishment | 2 | Rp 35.4M | 13 Oct 2025 | 97 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Sept 2026 | Low | PX_PRV-1319D | Replace lamp as per PM finding |
| 01 Jul 2026 | Low | PX_PRV-1319D | PRV-1319D passing |
| 20 May 2025 | Low | PX_PRV-1319D | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jul 2026 | 1 | 201000008232 | Corrective |
| 26 Nov 2025 | 2 | 201000014700 | Corrective |