IMPELLER,DWG.588-3536,FOR PP-413
Material 4300059312 · IMPELLER · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4300059312
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 210 d · P80 276 d
- Unit price
- Rp 43.6M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~210 days; expected demand during lead time 0.5.
- 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 08 Jun 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 43.6M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 468 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 492.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-413 C3 RECYCLE PUMP | B | 1 | 7 | 2.76 |
Lead time and procurement
Lead time 210 ± 88 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Aug 2026 | PR03 Regular replenishment | 2 | Rp 43.6M | 08 Jun 2027 open | 286 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Jun 2026 | Medium | PX_PP-413 | PP-413 discharge pressure low |
| 26 May 2026 | Medium | PX_PP-413 | PP-413 high vibration |
| 30 Apr 2026 | Low | PX_PP-413 | Replace lamp as per PM finding |
| 30 Mar 2026 | Low | PX_PP-413 | [MSI-B-26-ECN-211/M] Replace line |
| 03 Dec 2025 | Low | PX_PP-413 | PP-413 high vibration |
| 11 Aug 2025 | Medium | PX_PP-413 | Replace lamp as per PM finding |
| 24 May 2025 | Low | PX_PP-413 | [MSI-B-25-HTV-309/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jun 2025 | 1 | 201000029047 | Corrective |