Sparely
DU

IMPELLER,DWG.588-3536,FOR PP-413

Material 4300059312 · IMPELLER · Plant 1000

BLong-leadMonitorSlow-moving
Material
4300059312
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
210 d · P80 276 d
Unit price
Rp 43.6M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~210 days; expected demand during lead time 0.5.
  • 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 08 Jun 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 43.6M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 468 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 492.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-413
C3 RECYCLE PUMP
B172.76

Lead time and procurement

Lead time 210 ± 88 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
26 Aug 2026PR03
Regular replenishment
2Rp 43.6M08 Jun 2027
open
286 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Jun 2026MediumPX_PP-413PP-413 discharge pressure low
26 May 2026MediumPX_PP-413PP-413 high vibration
30 Apr 2026LowPX_PP-413Replace lamp as per PM finding
30 Mar 2026LowPX_PP-413[MSI-B-26-ECN-211/M] Replace line
03 Dec 2025LowPX_PP-413PP-413 high vibration
11 Aug 2025MediumPX_PP-413Replace lamp as per PM finding
24 May 2025LowPX_PP-413[MSI-B-25-HTV-309/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
20 Jun 20251201000029047Corrective