Sparely
DU

IMPELLER,DWG.928-3926,FOR PP-413

Material 4300059341 · IMPELLER · Plant 1000

BMaintainCritical insurance spare
Material
4300059341
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~184 days; expected demand during lead time 0.1.
  • 3.A 94.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.5%
stockout risk now 0%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 63.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-413
C3 RECYCLE PUMP
B172.76

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Jun 2026MediumPX_PP-413PP-413 discharge pressure low
26 May 2026MediumPX_PP-413PP-413 high vibration
30 Apr 2026LowPX_PP-413Replace lamp as per PM finding
30 Mar 2026LowPX_PP-413[MSI-B-26-ECN-211/M] Replace line
03 Dec 2025LowPX_PP-413PP-413 high vibration
11 Aug 2025MediumPX_PP-413Replace lamp as per PM finding
24 May 2025LowPX_PP-413[MSI-B-25-HTV-309/M] Replace line

Recent goods issues

Never issued in the 17-month history.