SPRING,SAFETY VALVE,DWG.755-3767,FOR PRV
Material 4300059789 · SPRING · Plant 1000
SSafety-criticalLong-leadReduceExcess
- Material
- 4300059789
- Category
- SPRING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- PRIMA INDUSTRI SENTOSA PT
- Lead time
- 159 d · P80 229 d
- Unit price
- Rp 23.6M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~159 days; expected demand during lead time 1.1.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
- 5.Stock 96 exceeds the level to keep (8) by 88.
- 6.Long lead time: 80% of deliveries took up to 229 days and the fastest seen in its category 77 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle source
On hand / on order
96 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 23.6M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 4 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~77 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-478A SAFETY VALVE CL-1290 | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 159 ± 76 days (PO history, 4 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Mar 2026 | PR03 Regular replenishment | 1 | Rp 23.0M | 17 Sept 2026 | 181 d |
| 05 Nov 2025 | PR03 Regular replenishment | 1 | Rp 23.4M | 01 Jan 2026 | 57 d |
| 31 May 2025 | PR06 Regular replenishment | 1 | Rp 23.8M | 04 Feb 2026 | 249 d |
| 19 May 2025 | PR04 Regular (other) | 2 | Rp 24.7M | 21 Dec 2025 | 216 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 1 | 206000026719 | Other maintenance |
| 26 Sept 2026 | 2 | 206000026719 | Other maintenance |