TRIM SET,CONTROL VALVE,DWG.211-3188,FOR

Material 4300060166 · TRIM SET · Plant 1000

CReduceExcess
Material
4300060166
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
DUTA MANDIRI MAKMUR PT
Lead time
141 d · P80 236 d
Unit price
Rp 20.8M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~141 days; expected demand during lead time 0.2.
  • 3.A 84.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 3 exceeds the level to keep (1) by 2.
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
84.0%
stockout risk now 0%
Unit price
Rp 20.8M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 160 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-808
TEMPERATURE CONTROL VALVE
C120.55

Lead time and procurement

Lead time 141 ± 83 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
11 Apr 2026PR06
Regular replenishment
2Rp 20.9M16 Aug 2026127 d
25 Sept 2025PR06
Regular replenishment
1Rp 20.7M04 Jan 2026101 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Oct 2025LowPX_TCV-808TCV-808; small leak at packing
02 May 2025MediumPX_TCV-808Overhaul TCV-808

Recent goods issues

Posting dateQtyOrderOrder type
24 Apr 20261201000002099Corrective