DEMISTER PAD,DWG.557-3700,FOR VD-973

Material 4300060193 · DEMISTER PAD · Plant 1000

ALong-leadMonitorStockout
Material
4300060193
Category
DEMISTER PAD
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
106 d · P80 131 d
Unit price
Rp 21.0M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~106 days; expected demand during lead time 0.1.
  • 3.A 97.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 20 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.1%
stockout risk now 3%
Unit price
Rp 21.0M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 498 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 74.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-973
QUENCH OIL ACCUMULATOR
A110.08

Lead time and procurement

Lead time 106 ± 45 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
01 Sept 2026PR06
Regular replenishment
1Rp 21.0M20 Nov 2026
open
80 d
02 Mar 2026PR03
Regular replenishment
1Rp 21.0M22 Jul 2026142 d
13 May 2025PR06
Regular replenishment
1Rp 21.0M04 Sept 2025114 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 May 2025LowPX_VD-973Install scaffolding at VD-973

Recent goods issues

Posting dateQtyOrderOrder type
21 May 20252201000008137Corrective