DEMISTER PAD,DWG.557-3700,FOR VD-973
Material 4300060193 · DEMISTER PAD · Plant 1000
ALong-leadMonitorStockout
- Material
- 4300060193
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 106 d · P80 131 d
- Unit price
- Rp 21.0M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~106 days; expected demand during lead time 0.1.
- 3.A 97.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 20 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.1%
stockout risk now 3%
Unit price
Rp 21.0M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 498 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 74.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-973 QUENCH OIL ACCUMULATOR | A | 1 | 1 | 0.08 |
Lead time and procurement
Lead time 106 ± 45 days (PO history, 3 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Sept 2026 | PR06 Regular replenishment | 1 | Rp 21.0M | 20 Nov 2026 open | 80 d |
| 02 Mar 2026 | PR03 Regular replenishment | 1 | Rp 21.0M | 22 Jul 2026 | 142 d |
| 13 May 2025 | PR06 Regular replenishment | 1 | Rp 21.0M | 04 Sept 2025 | 114 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2025 | Low | PX_VD-973 | Install scaffolding at VD-973 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 May 2025 | 2 | 201000008137 | Corrective |