SEAT RING,VALVE,DWG.704-8652,FOR TCV-514

Material 4300060332 · SEAT RING · Plant 1000

BLong-leadMaintainCritical insurance spare
Material
4300060332
Category
SEAT RING
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
126 d · P80 184 d
Unit price
Rp 10.6M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~126 days; expected demand during lead time 0.0.
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 05 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.6%
stockout risk now 0%
Unit price
Rp 10.6M
PO history
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-514
HE-1904A TEMP CONTROL
B120.98

Lead time and procurement

Lead time 126 ± 58 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jun 2026PR06
Regular replenishment
1Rp 10.6M05 Dec 2026
open
172 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Apr 2026LowPX_TCV-514Leak from packing
17 Jun 2025LowPX_TCV-514TCV-514 stuck

Recent goods issues

Never issued in the 17-month history.