COUPLING,DWG.241-4360,FOR KC-843
Material 4300060648 · COUPLING · Plant 1000
SReorderHighStockout
- Material
- 4300060648
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 86 d · P80 139 d
- Unit price
- Rp 8.6M (est.)
Recommendation
- 1.Forecast 2.5 SET/year: 2.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~86 days; expected demand during lead time 0.6.
- 3.A 55.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
Proposed purchase requisition
3 SET
Rp 25.7M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
55.1%
stockout risk now 45%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 318 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-843 FUEL OIL COMPRESSOR | S | 1 | 21 | 8.28 |
Lead time and procurement
Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_KC-843 | Painting KC-843 |
| 16 Sept 2026 | Low | PX_KC-843 | Inspect coupling KC-843 |
| 29 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_KC-843 | [MSI-B-26-RLH-211] Permanent repair |
| 14 Aug 2026 | Medium | PX_KC-843 | KC-843 lube oil filter DP high |
| 06 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 02 Aug 2026 | Emergency | PX_KC-843 | [MSI-B-26-KRX-321] Permanent repair |
| 14 Jul 2026 | Medium | PX_KC-843 | KC-843 bearing temp high |
| 09 Jun 2026 | Low | PX_KC-843 | Overhaul |
| 20 May 2026 | Medium | PX_KC-843 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Nov 2025 | 1 | 201000017157 | Corrective |