RING,WEAR,DWG.594-6548,FOR PP-490

Material 4300060935 · RING · Plant 1000

SReorderHighStockout
Material
4300060935
Category
RING
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
92 d · P80 143 d
Unit price
Rp 8.2M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~92 days; expected demand during lead time 0.2.
  • 3.A 81.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
Proposed purchase requisition
1 EA
Rp 8.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
81.2%
stockout risk now 19%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 323 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~59 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PP-490
COOLING WATER PUMP
S162.33

Lead time and procurement

Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Aug 2026MediumPY_PP-490PP-490 high vibration
23 Jan 2026HighPY_PP-490Replace lamp as per PM finding
13 Dec 2025MediumPY_PP-490PP-490 seal leak
07 Nov 2025LowPY_PP-490Replace bearing PP-490
05 Nov 2025LowPY_PP-490Oil leak at PP-490 bearing housing
07 May 2025MediumPY_PP-490Overhaul PP-490

Recent goods issues

Posting dateQtyOrderOrder type
12 Nov 20251201000012271Corrective