RING,WEAR,DWG.594-6548,FOR PP-490
Material 4300060935 · RING · Plant 1000
SReorderHighStockout
- Material
- 4300060935
- Category
- RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 92 d · P80 143 d
- Unit price
- Rp 8.2M (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~92 days; expected demand during lead time 0.2.
- 3.A 81.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
Proposed purchase requisition
1 EA
Rp 8.2M · order by 01 Oct 2026
Expected arrival ≈ 92 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
81.2%
stockout risk now 19%
Unit price
Rp 8.2M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 323 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~59 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-490 COOLING WATER PUMP | S | 1 | 6 | 2.33 |
Lead time and procurement
Lead time 92 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Aug 2026 | Medium | PY_PP-490 | PP-490 high vibration |
| 23 Jan 2026 | High | PY_PP-490 | Replace lamp as per PM finding |
| 13 Dec 2025 | Medium | PY_PP-490 | PP-490 seal leak |
| 07 Nov 2025 | Low | PY_PP-490 | Replace bearing PP-490 |
| 05 Nov 2025 | Low | PY_PP-490 | Oil leak at PP-490 bearing housing |
| 07 May 2025 | Medium | PY_PP-490 | Overhaul PP-490 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Nov 2025 | 1 | 201000012271 | Corrective |