POSITIONER,VALVE,DWG.872-2057,FOR TCV-12

Material 4300061045 · POSITIONER · Plant 1000

CMaintainNo stock needed
Material
4300061045
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
GUNUNG PERKASA NUSANTARA PT
Lead time
72 d · P80 66 d
Unit price
Rp 50.7M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~72 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 15 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 50.7M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 86,091/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1240B
HE-163D TEMP CONTROL
C100.12

Lead time and procurement

Lead time 72 ± 50 days (PO history, 3 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
16 Sept 2026PR04
Regular (other)
2Rp 50.7M15 Dec 2026
open
90 d
14 Jun 2026PR06
Regular replenishment
1Rp 50.0M14 Jul 202630 d
04 May 2026PR03
Regular replenishment
1Rp 51.4M29 May 202625 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.