COUPLING,DWG.257-2696,FOR KC-582B

Material 4300061273 · COUPLING · Plant 1000

SMaintainHealthy
Material
4300061273
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
86 d · P80 139 d
Unit price
Rp 8.6M (est.)

Recommendation

  • 1.Forecast 1.4 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 0.3.
  • 3.A 72.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
72.4%
stockout risk now 0%
Unit price
Rp 8.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 114 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-582B
CAUSTIC BLOWER
S1103.57

Lead time and procurement

Lead time 86 ± 54 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026HighPX_KC-582BKC-582B high vibration
26 Aug 2026LowPX_KC-582BPainting KC-582B
08 Jul 2026LowPX_KC-582BInstall scaffolding at KC-582B
28 Apr 2026HighPX_KC-582BKC-582B lube oil filter DP high
20 Apr 2026EmergencyPX_KC-582BRepair insulation KC-582B
05 Nov 2025MediumPX_KC-582BReplace lamp as per PM finding
15 Oct 2025MediumPX_KC-582BOverhaul
03 Oct 2025MediumPX_KC-582BKC-582B lube oil filter DP high
26 Sept 2025MediumPX_KC-582BKC-582B lube oil filter DP high
06 May 2025MediumPX_KC-582BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
09 Jun 20261201000002348Corrective