SEAL,LABYRINTH,DWG.896-6351,FOR KC-890A

Material 4300061510 · SEAL · Plant 1000

SReduceSlow-moving
Material
4300061510
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PERMATA SUPLINDO JAYA PT
Lead time
189 d · P80 213 d
Unit price
Rp 47.7M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~189 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 17 exceeds the level to keep (0) by 17.
Single sourceOpen PO
On hand / on order
17 / 2
next delivery 14 Aug 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 47.7M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 137,980/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-890A
INHIBITOR FAN
S121.00

Lead time and procurement

Lead time 189 ± 65 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
30 Aug 2026PR01
Import / long-lead
2Rp 47.6M14 Aug 2027
open
349 d
30 Jan 2026PR03
Regular replenishment
1Rp 47.7M24 Jun 2026145 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Oct 2025MediumPX_KC-890ALeak from packing
17 May 2025LowPX_KC-890AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
15 Jul 20251203000031669Turnaround