COUPLING,DWG.466-7251,FOR KC-890A
Material 4300061542 · COUPLING · Plant 1000
SMonitorNo stock needed
- Material
- 4300061542
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 130 d · P80 139 d
- Unit price
- Rp 5.4M
Recommendation
- 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~130 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 1%
Unit price
Rp 5.4M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 108,624/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~44 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-890A INHIBITOR FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 130 ± 54 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Sept 2025 | PR03 Regular replenishment | 2 | Rp 5.4M | 18 Jun 2026 | 263 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Oct 2025 | Medium | PX_KC-890A | Leak from packing |
| 17 May 2025 | Low | PX_KC-890A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Jul 2025 | 1 | 203000031669 | Turnaround |