TRIM SET,CONTROL VALVE,DWG.344-2308,FOR

Material 4300061877 · TRIM SET · Plant 1000

ALong-leadReduceNon-moving
Material
4300061877
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
123 d · P80 236 d
Unit price
Rp 47.6M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~123 days; expected demand during lead time 0.0.
  • 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 2 exceeds the level to keep (1) by 1.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 09 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.1%
stockout risk now 0%
Unit price
Rp 47.6M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 91.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-1256
PP-1570A TEMP CONTROL
A141.40

Lead time and procurement

Lead time 123 ± 83 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
20 Aug 2026PR06
Regular replenishment
2Rp 47.7M09 Oct 2026
open
50 d
27 Mar 2026PR06
Regular replenishment
2Rp 47.4M24 Jun 202689 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Jul 2026LowPX_TCV-1256TCV-1256; IA leak from regulator
29 Jul 2026MediumPX_TCV-1256Overhaul TCV-1256
16 Apr 2026MediumPX_TCV-1256Replace lamp as per PM finding
05 May 2025MediumPX_TCV-1256Overhaul TCV-1256

Recent goods issues

Never issued in the 17-month history.