Sparely
DU

VALVE,GOVERNOR,DWG.326-2228,FOR KT-875

Material 4300062044 · VALVE · Plant 1000

SReducePotentially obsolete
Material
4300062044
Category
VALVE
Base unit
ASS
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI REFRAKTORI PRATAMA PT
Lead time
98 d · P80 92 d
Unit price
Rp 234.4M

Recommendation

  • 1.Forecast 0.0 ASS/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~98 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 1 exceeds the level to keep (0) by 1.
Convert to Non StockSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 234.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 91,446/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~20 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 98 ± 30 days (PO history + category, 1 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2025PR03
Regular replenishment
1Rp 234.4M30 Mar 2026249 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.