Sparely
DU

SEAT RING,VALVE,DWG.607-3377,FOR PCV-146

Material 4300063378 · SEAT RING · Plant 1000

AMonitorInsurance gap
Material
4300063378
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
110 d · P80 184 d
Unit price
Rp 11.3M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~110 days; expected demand during lead time 0.0.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.4%
stockout risk now 1%
Unit price
Rp 11.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 28.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1466B
BY PASS DUCT
A120.51

Lead time and procurement

Lead time 110 ± 58 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026LowPX_PCV-1466BPCV-1466B; valve hunting
23 May 2025LowPX_PCV-1466BReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.