SLEEVE,SHAFT,DWG.251-5452,FOR PP-743D

Material 4300063402 · SLEEVE · Plant 1000

CMaintainNo stock needed
Material
4300063402
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
126 d · P80 210 d
Unit price
Rp 7.1M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~126 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 1%
Unit price
Rp 7.1M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 713,877/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~67 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-743D
METHANOL PUMP
C120.62

Lead time and procurement

Lead time 126 ± 55 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
12 Nov 2025PR06
Regular replenishment
2Rp 7.1M19 Feb 202699 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Apr 2026MediumPX_PP-743DLeak from packing
04 May 2025MediumPX_PP-743D[MSI-B-25-AXB-205] Permanent repair

Recent goods issues

Never issued in the 17-month history.