IMPELLER,DWG.742-3894,FOR PP-474A

Material 4300063598 · IMPELLER · Plant 1000

BLong-leadReduceExcess
Material
4300063598
Category
IMPELLER
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
MITRA PERKASA NUSANTARA PT
Lead time
182 d · P80 276 d
Unit price
Rp 132.9M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~182 days; expected demand during lead time 0.2.
  • 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
3 / 1
next delivery 21 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.5%
stockout risk now 0%
Unit price
Rp 132.9M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 147 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 271.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-474A
LUBE OIL PUMP
B120.62

Lead time and procurement

Lead time 182 ± 88 days (PO history + category, 2 PO lines) · on-time 48%

PR dateTypeQtyUnit priceDeliveryLead time
13 Jul 2026PR03
Regular replenishment
1Rp 132.3M21 Nov 2026
open
131 d
28 Aug 2025PR06
Regular replenishment
2Rp 133.5M13 Apr 2026228 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2025LowPX_PP-474AOverhaul PP-474A
28 May 2025LowPX_PP-474APP-474A high vibration

Recent goods issues

Posting dateQtyOrderOrder type
07 May 20261201000007370Corrective