TRIM SET,CONTROL VALVE,DWG.377-3855,FOR

Material 4300063674 · TRIM SET · Plant 1000

BLong-leadReduceNon-moving
Material
4300063674
Category
TRIM SET
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
SURYA PERKASA SENTOSA PT
Lead time
142 d · P80 236 d
Unit price
Rp 77.7M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~142 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 5 exceeds the level to keep (0) by 5.
  • 5.Long lead time: 80% of deliveries took up to 236 days and the fastest seen in its category 75 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Non StockSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 77.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~75 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1990A
SEAL OIL FLOW CONTROL
B100.11

Lead time and procurement

Lead time 142 ± 83 days (PO history + category, 1 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
23 Oct 2025PR03
Regular replenishment
2Rp 77.7M20 Jan 202689 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.