Sparely
DU

SLEEVE,SHAFT,DWG.359-7852,FOR PP-1194

Material 4300064291 · SLEEVE · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4300064291
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
ANUGRAH INSTRUMEN SENTOSA PT
Lead time
110 d · P80 101 d
Unit price
Rp 5.9M

Recommendation

  • 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~110 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.On hand 6 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 101 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 17.8M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Long-leadSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 701.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1194
FEED PUMP
A121.05

Lead time and procurement

Lead time 110 ± 45 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jan 2026PR03
Regular replenishment
2Rp 6.1M22 Mar 202665 d
15 Jan 2026PR03
Regular replenishment
1Rp 5.8M20 May 2026125 d
08 May 2025PR06
Regular replenishment
1Rp 5.9M13 Jul 202566 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Dec 2025MediumPX_PP-1194PP-1194 seal leak
07 Jun 2025MediumPX_PP-1194PP-1194 seal leak

Recent goods issues

Posting dateQtyOrderOrder type
03 Jan 20263201000039014Corrective