SLEEVE,SHAFT,DWG.359-7852,FOR PP-1194
Material 4300064291 · SLEEVE · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4300064291
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- ANUGRAH INSTRUMEN SENTOSA PT
- Lead time
- 110 d · P80 101 d
- Unit price
- Rp 5.9M
Recommendation
- 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~110 days; expected demand during lead time 0.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
- 4.On hand 6 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 101 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 17.8M · order by 01 Oct 2026
Expected arrival ≈ 110 days
Long-leadSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 701.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1194 FEED PUMP | A | 1 | 2 | 1.05 |
Lead time and procurement
Lead time 110 ± 45 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jan 2026 | PR03 Regular replenishment | 2 | Rp 6.1M | 22 Mar 2026 | 65 d |
| 15 Jan 2026 | PR03 Regular replenishment | 1 | Rp 5.8M | 20 May 2026 | 125 d |
| 08 May 2025 | PR06 Regular replenishment | 1 | Rp 5.9M | 13 Jul 2025 | 66 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Dec 2025 | Medium | PX_PP-1194 | PP-1194 seal leak |
| 07 Jun 2025 | Medium | PX_PP-1194 | PP-1194 seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Jan 2026 | 3 | 201000039014 | Corrective |