DEMISTER PAD,DWG.751-7240,FOR CL-932
Material 4300064449 · DEMISTER PAD · Plant 1000
ALong-leadReduceSlow-moving
- Material
- 4300064449
- Category
- DEMISTER PAD
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 113 d · P80 147 d
- Unit price
- Rp 55.5M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~113 days; expected demand during lead time 0.2.
- 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Stock 4 exceeds the level to keep (2) by 2.
- 5.Long lead time: 80% of deliveries took up to 147 days and the fastest seen in its category 34 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
4 / 2
next delivery 03 Jan 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.6%
stockout risk now 0%
Unit price
Rp 55.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 432 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 420.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~34 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-932 RICH AMINE COLUMN | A | 1 | 5 | 1.66 |
Lead time and procurement
Lead time 113 ± 59 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Aug 2026 | PR06 Regular replenishment | 2 | Rp 55.5M | 03 Jan 2027 open | 155 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 31 Aug 2026 | Low | PX_CL-932 | CL-932 DP high |
| 20 Aug 2026 | Medium | PX_CL-932 | CL-932 DP high |
| 02 Jul 2026 | Medium | PX_CL-932 | Inspect CL-932 internal |
| 02 Jun 2026 | Medium | PX_CL-932 | Install scaffolding at CL-932 |
| 31 May 2025 | Medium | PX_CL-932 | PSM25/Inspect CL-932 internal |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jul 2025 | 1 | 201000026768 | Corrective |