SLEEVE,SHAFT,DWG.405-8228,FOR PP-1155C
Material 4300064481 · SLEEVE · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300064481
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 155 d · P80 210 d
- Unit price
- Rp 5.0M
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~155 days; expected demand during lead time 0.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 24.9M · order by 01 Oct 2026
Expected arrival ≈ 155 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 36%
Unit price
Rp 5.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 375 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 373.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.
Installed on 1 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1155C CONDENSATE PUMP | B | 3 | 9 | 3.19 |
Lead time and procurement
Lead time 155 ± 55 days (PO history + category, 1 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Jul 2025 | PR06 Regular replenishment | 1 | Rp 5.0M | 13 Feb 2026 | 215 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jun 2026 | High | PX_PP-1155C | Overhaul PP-1155C |
| 20 May 2026 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 18 Apr 2026 | Medium | PX_PP-1155C | Leak from packing |
| 18 Mar 2026 | Medium | PX_PP-1155C | Install scaffolding at PP-1155C |
| 27 Jan 2026 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 16 Nov 2025 | Medium | PX_PP-1155C | Replace lamp as per PM finding |
| 24 Oct 2025 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
| 13 Sept 2025 | High | PX_PP-1155C | Replace bearing PP-1155C |
| 06 May 2025 | Medium | PX_PP-1155C | PP-1155C discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Sept 2025 | 1 | 201000018813 | Corrective |