SLEEVE,SHAFT,DWG.405-8228,FOR PP-1155C

Material 4300064481 · SLEEVE · Plant 1000

BLong-leadReorderCriticalStockout
Material
4300064481
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
155 d · P80 210 d
Unit price
Rp 5.0M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~155 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 24.9M · order by 01 Oct 2026
Expected arrival ≈ 155 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 36%
Unit price
Rp 5.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 375 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 373.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~67 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1155C
CONDENSATE PUMP
B393.19

Lead time and procurement

Lead time 155 ± 55 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
13 Jul 2025PR06
Regular replenishment
1Rp 5.0M13 Feb 2026215 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jun 2026HighPX_PP-1155COverhaul PP-1155C
20 May 2026MediumPX_PP-1155CPP-1155C discharge pressure low
18 Apr 2026MediumPX_PP-1155CLeak from packing
18 Mar 2026MediumPX_PP-1155CInstall scaffolding at PP-1155C
27 Jan 2026MediumPX_PP-1155CPP-1155C discharge pressure low
16 Nov 2025MediumPX_PP-1155CReplace lamp as per PM finding
24 Oct 2025MediumPX_PP-1155CPP-1155C discharge pressure low
13 Sept 2025HighPX_PP-1155CReplace bearing PP-1155C
06 May 2025MediumPX_PP-1155CPP-1155C discharge pressure low

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20251201000018813Corrective