POSITIONER,VALVE,DWG.680-4201,FOR PCV-13
Material 4300064540 · POSITIONER · Plant 1000
CMaintainHealthy
- Material
- 4300064540
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 67 d · P80 48 d
- Unit price
- Rp 25.9M
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~67 days; expected demand during lead time 0.1.
- 3.A 94.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single sourceOpen PO
On hand / on order
1 / 2
next delivery 24 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.5%
stockout risk now 0%
Unit price
Rp 25.9M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1300 BY PASS DUCT | C | 1 | 1 | 0.08 |
Lead time and procurement
Lead time 67 ± 31 days (PO history, 4 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Aug 2026 | PR06 Regular replenishment | 2 | Rp 26.7M | 24 Oct 2026 open | 55 d |
| 10 May 2026 | PR03 Regular replenishment | 2 | Rp 25.9M | 21 Jun 2026 | 42 d |
| 29 Oct 2025 | PR03 Regular replenishment | 2 | Rp 25.9M | 11 Dec 2025 | 43 d |
| 28 Jul 2025 | PR03 Regular replenishment | 2 | Rp 25.6M | 10 Sept 2025 | 44 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 May 2025 | Low | PX_PCV-1300 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Apr 2026 | 1 | 201000003856 | Corrective |