SEAL,LABYRINTH,DWG.277-5648,FOR KC-830D

Material 4300064969 · SEAL · Plant 1000

SReduceExcess
Material
4300064969
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
ATLAS TURBO SERVICES INC
Lead time
136 d · P80 213 d
Unit price
Rp 196.6M

Recommendation

  • 1.Forecast 1.0 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~136 days; expected demand during lead time 0.4.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockSingle sourceOpen PO
On hand / on order
2 / 1
next delivery 05 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 196.6M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 66 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~71 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-830D
FLUSHING OIL BLOWER
S141.85

Lead time and procurement

Lead time 136 ± 65 days (PO history + category, 1 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
15 Jun 2025PR03
Regular replenishment
2Rp 191.5M18 Sept 202595 d
13 Jun 2025PR03
Regular replenishment
1Rp 201.8M05 Dec 2026
open
540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
31 May 2026LowPX_KC-830DKC-830D high vibration
06 Mar 2026MediumPX_KC-830DInstall scaffolding at KC-830D
28 Nov 2025MediumPX_KC-830DKC-830D bearing temp high
25 Aug 2025LowPX_KC-830DKC-830D high vibration

Recent goods issues

Posting dateQtyOrderOrder type
27 Jul 20261202000021423Emergency