SEAT RING,VALVE,DWG.262-1832,FOR LCV-124
Material 4300065132 · SEAT RING · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4300065132
- Category
- SEAT RING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 120 d · P80 184 d
- Unit price
- Rp 6.8M
Recommendation
- 1.Forecast 2.7 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~120 days; expected demand during lead time 2.3 (incl. 2.1 planned).
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 8.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 6 now.
- 5.Long lead time: 80% of deliveries took up to 184 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 40.9M · order by 01 Oct 2026
Expected arrival ≈ 120 days
Long-leadConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
0 / 2
next delivery 05 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 3
Rec. Max
8
order qty 3
Service level
99.6%
stockout risk now 100%
Unit price
Rp 6.8M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 219 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 92.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~65 days.
Installed on 1 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1246 HE-554 LEVEL CONTROL | B | 3 | 0 | 0.12 |
Lead time and procurement
Lead time 120 ± 58 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Jul 2026 | PR03 Regular replenishment | 2 | Rp 7.1M | 05 Jan 2027 open | 175 d |
| 21 Sept 2025 | PR06 Regular replenishment | 2 | Rp 6.6M | 24 Dec 2025 | 94 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_LCV-1246 | Final Element Overhaul; Control Valve | 2.15 |
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Feb 2026 | 2 | 201000011061 | Corrective |