TRIM SET,CONTROL VALVE,DWG.391-3361,FOR

Material 4300065192 · TRIM SET · Plant 1000

CMonitorNo stock needed
Material
4300065192
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
193 d · P80 242 d
Unit price
Rp 229.6M

Recommendation

  • 1.Forecast 0.2 SET/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~193 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 01 Feb 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 229.6M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 284 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1956A
HE-1483A PRESSURE CONTROL
C100.08

Lead time and procurement

Lead time 193 ± 55 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
26 Aug 2026PR06
Regular replenishment
1Rp 228.2M04 Apr 2027
open
221 d
21 May 2026PR06
Regular replenishment
1Rp 229.6M01 Feb 2027
open
256 d
25 Oct 2025PR06
Regular replenishment
2Rp 243.3M17 May 2026204 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 20251201000021150Corrective