DISC,SAFETY VALVE,DWG.136-1721,FOR PRV-3
Material 4300065675 · DISC · Plant 1000
ASafety-criticalMaintainHealthy
- Material
- 4300065675
- Category
- DISC
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 88 d · P80 171 d
- Unit price
- Rp 20.9M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~88 days; expected demand during lead time 0.1.
- 4.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Single sourceOpen POLead time estimated
On hand / on order
2 / 2
next delivery 27 Feb 2028
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 20.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 84 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 378.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PRV-388 SAFETY VALVE HE-1547 | A | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 88 ± 64 days (Category estimate, 0 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 May 2026 | PR05 Project / turnaround | 2 | Rp 20.9M | 27 Feb 2028 open | 637 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jul 2026 | 1 | 201000035271 | Corrective |