Sparely
DU

POSITIONER,VALVE,DWG.960-5905,FOR LCV-16

Material 4300066316 · POSITIONER · Plant 1000

AReorderNormalBelow reorder point
Material
4300066316
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 119.8M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 2%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 171 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 796.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1620
LEVEL CONTROL VALVE
A152.26

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Aug 2026MediumPX_LCV-1620Repair insulation LCV-1620
09 Apr 2026MediumPX_LCV-1620LCV-1620 passing
19 Dec 2025LowPX_LCV-1620LCV-1620; small leak at packing
01 Nov 2025MediumPX_LCV-1620LCV-1620 stuck
26 Jun 2025MediumPX_LCV-1620Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
13 Apr 20262201000004394Corrective