POSITIONER,VALVE,DWG.589-7507,FOR LCV-16
Material 4300066332 · POSITIONER · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4300066332
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI SEJAHTERA ABADI PT
- Lead time
- 90 d · P80 166 d
- Unit price
- Rp 17.2M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~90 days; expected demand during lead time 0.2.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 17.2M · order by 01 Oct 2026
Expected arrival ≈ 90 days
Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 17.2M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 173 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 794.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1620 LEVEL CONTROL VALVE | A | 1 | 5 | 2.26 |
Lead time and procurement
Lead time 90 ± 64 days (PO history + category, 1 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Nov 2025 | PR03 Regular replenishment | 1 | Rp 17.2M | 22 Jan 2026 | 73 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Aug 2026 | Medium | PX_LCV-1620 | Repair insulation LCV-1620 |
| 09 Apr 2026 | Medium | PX_LCV-1620 | LCV-1620 passing |
| 19 Dec 2025 | Low | PX_LCV-1620 | LCV-1620; small leak at packing |
| 01 Nov 2025 | Medium | PX_LCV-1620 | LCV-1620 stuck |
| 26 Jun 2025 | Medium | PX_LCV-1620 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Apr 2026 | 1 | 201000004394 | Corrective |