DISC,SAFETY VALVE,DWG.305-6416,FOR PRV-9

Material 4300066488 · DISC · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4300066488
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
97 d · P80 171 d
Unit price
Rp 9.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~97 days; expected demand during lead time 0.0.
  • 4.A 97.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 1 now.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 9.6M · order by 01 Oct 2026
Expected arrival ≈ 97 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.7%
stockout risk now 2%
Unit price
Rp 9.6M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 81.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-986
SAFETY VALVE HE-213B
A110.04

Lead time and procurement

Lead time 97 ± 64 days (PO history + category, 2 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
13 Nov 2025PR03
Regular replenishment
1Rp 9.7M26 Mar 2026133 d
08 Aug 2025PR06
Regular replenishment
2Rp 9.5M03 Nov 202587 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 May 2025MediumPX_PRV-986Recertification PRV-986

Recent goods issues

Posting dateQtyOrderOrder type
08 May 20251201000028366Corrective