DISC,SAFETY VALVE,DWG.676-7318,FOR PRV-7

Material 4300066588 · DISC · Plant 1000

SSafety-criticalLong-leadReorderCriticalStockout
Material
4300066588
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
76 d · P80 171 d
Unit price
Rp 26.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~76 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 6.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
2 EA
Rp 53.2M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 7%
Unit price
Rp 26.6M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 245 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 323.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-720B
SAFETY VALVE HE-1164D
S110.47

Lead time and procurement

Lead time 76 ± 64 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
24 Dec 2025PR06
Regular replenishment
2Rp 26.8M26 Jan 202633 d
01 Dec 2025PR06
Regular replenishment
1Rp 26.4M21 Feb 202682 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Jun 2025LowPX_PRV-720BPRV-720B passing

Recent goods issues

Posting dateQtyOrderOrder type
29 Jan 20261201000009042Corrective