Sparely
DU

DISC,SAFETY VALVE,DWG.215-2077,FOR PRV-1

Material 4300066596 · DISC · Plant 1000

ASafety-criticalLong-leadReduceSlow-moving
Material
4300066596
Category
DISC
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
TIRTA SEJAHTERA PERSADA PT
Lead time
95 d · P80 175 d
Unit price
Rp 5.8M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~95 days; expected demand during lead time 0.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 5.Stock 8 exceeds the level to keep (5) by 3.
  • 6.Long lead time: 80% of deliveries took up to 175 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
8 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 5.8M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 425 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 468.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1711
SAFETY VALVE HE-563D
A110.04

Lead time and procurement

Lead time 95 ± 64 days (PO history, 6 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
30 Dec 2025PR03
Regular replenishment
2Rp 5.9M04 Feb 202636 d
28 Nov 2025PR06
Regular replenishment
3Rp 6.1M27 May 2026180 d
06 Oct 2025PR06
Regular replenishment
1Rp 5.7M22 Dec 202577 d
06 Jul 2025PR06
Regular replenishment
2Rp 5.8M18 Aug 202543 d
01 Jul 2025PR03
Regular replenishment
1Rp 5.8M19 Sept 202580 d
18 May 2025PR06
Regular replenishment
3Rp 5.7M09 Nov 2025175 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 May 2025LowPX_PRV-1711Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
02 Aug 20252204000001961Preventive
05 Jun 20251201000019262Corrective
04 Jun 20251201000019262Corrective