THERMOWELL,DWG.112-4051,FOR TEL-1942-2
Material 4300067020 · THERMOWELL · Plant 1000
CMonitorStockout
- Material
- 4300067020
- Category
- THERMOWELL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- LANGIT SEJAHTERA PRATAMA PT
- Lead time
- 95 d · P80 140 d
- Unit price
- Rp 9.6M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~95 days; expected demand during lead time 0.1.
- 3.A 94.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single sourceOpen PO
On hand / on order
0 / 2
next delivery 02 Mar 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.9%
stockout risk now 0%
Unit price
Rp 9.6M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 261 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~43 days.
Installed on 1 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1942-2 TEMPERATURE | C | 3 | 0 | 0.01 |
Lead time and procurement
Lead time 95 ± 40 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jul 2026 | PR03 Regular replenishment | 2 | Rp 9.8M | 02 Mar 2027 open | 215 d |
| 28 Oct 2025 | PR06 Regular replenishment | 1 | Rp 9.3M | 22 Nov 2025 | 25 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Jan 2026 | 1 | 201000032767 | Corrective |