COUPLING,DWG.313-7620,FOR PP-1192
Material 4300067601 · COUPLING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4300067601
- Category
- COUPLING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO LESTARI PT
- Lead time
- 73 d · P80 75 d
- Unit price
- Rp 34.1M
Recommendation
- 1.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~73 days; expected demand during lead time 0.2.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 102.4M · order by 01 Oct 2026
Expected arrival ≈ 73 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.3%
stockout risk now 11%
Unit price
Rp 34.1M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 289 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 558.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1192 FEED PUMP | A | 1 | 5 | 1.47 |
Lead time and procurement
Lead time 73 ± 39 days (PO history, 3 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 May 2026 | PR06 Regular replenishment | 1 | Rp 32.9M | 04 Jul 2026 | 35 d |
| 01 Aug 2025 | PR05 Project / turnaround | 2 | Rp 34.1M | 01 Oct 2025 | 61 d |
| 02 Jun 2025 | PR06 Regular replenishment | 2 | Rp 34.7M | 25 Aug 2025 | 84 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Jul 2026 | Medium | PX_PP-1192 | Install scaffolding at PP-1192 |
| 15 Jul 2026 | Low | PX_PP-1192 | Overhaul PP-1192 |
| 07 Jun 2026 | Emergency | PX_PP-1192 | Oil leak at PP-1192 bearing housing |
| 15 Oct 2025 | Emergency | PX_PP-1192 | [MSI-B-25-KEU-185] Permanent repair |
| 31 May 2025 | Low | PX_PP-1192 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Dec 2025 | 2 | 201000010670 | Corrective |