COUPLING,DWG.313-7620,FOR PP-1192

Material 4300067601 · COUPLING · Plant 1000

AReorderNormalSlow-moving
Material
4300067601
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
73 d · P80 75 d
Unit price
Rp 34.1M

Recommendation

  • 1.Forecast 1.2 SET/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~73 days; expected demand during lead time 0.2.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 102.4M · order by 01 Oct 2026
Expected arrival ≈ 73 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.3%
stockout risk now 11%
Unit price
Rp 34.1M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 289 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 558.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1192
FEED PUMP
A151.47

Lead time and procurement

Lead time 73 ± 39 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
30 May 2026PR06
Regular replenishment
1Rp 32.9M04 Jul 202635 d
01 Aug 2025PR05
Project / turnaround
2Rp 34.1M01 Oct 202561 d
02 Jun 2025PR06
Regular replenishment
2Rp 34.7M25 Aug 202584 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Jul 2026MediumPX_PP-1192Install scaffolding at PP-1192
15 Jul 2026LowPX_PP-1192Overhaul PP-1192
07 Jun 2026EmergencyPX_PP-1192Oil leak at PP-1192 bearing housing
15 Oct 2025EmergencyPX_PP-1192[MSI-B-25-KEU-185] Permanent repair
31 May 2025LowPX_PP-1192Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 Dec 20252201000010670Corrective