Sparely
DU

POSITIONER,VALVE,DWG.304-8726,FOR PCV-25

Material 4300068454 · POSITIONER · Plant 1000

CMaintainHealthy
Material
4300068454
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
95 d · P80 166 d
Unit price
Rp 39.9M (est.)

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.2.
  • 3.A 83.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
83.4%
stockout risk now 1%
Unit price
Rp 39.9M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 61 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-258
HE-1843C PRESSURE CONTROL
C430.94

Lead time and procurement

Lead time 95 ± 64 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Mar 2026LowPX_PCV-258PCV-258; valve hunting
10 Sept 2025MediumPX_PCV-258Replace lamp as per PM finding
24 May 2025LowPX_PCV-258PCV-258; valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
01 Aug 20261204000039030Preventive