THERMOWELL,DWG.767-6678,FOR TEL-298A

Material 4300068725 · THERMOWELL · Plant 1000

SMonitorNo stock needed
Material
4300068725
Category
THERMOWELL
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
HOKUTO INSTRUMENT CO LTD
Lead time
65 d · P80 65 d
Unit price
Rp 2.4M

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~65 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 2%
Unit price
Rp 2.4M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 394 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 323,967/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~43 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-298A
PP-821 BTM
S100.01

Lead time and procurement

Lead time 65 ± 30 days (PO history, 3 PO lines) · on-time 60%

PR dateTypeQtyUnit priceDeliveryLead time
23 Mar 2026PR06
Regular replenishment
1Rp 2.4M19 May 202657 d
02 Dec 2025PR06
Regular replenishment
2Rp 2.4M01 Jan 202630 d
20 Oct 2025PR03
Regular replenishment
2Rp 2.4M29 Dec 202570 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
02 Sept 20251201000026249Corrective