SEAL,LABYRINTH,DWG.372-4858,FOR KC-250D

Material 4300069145 · SEAL · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300069145
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN MAKMUR PT
Lead time
177 d · P80 213 d
Unit price
Rp 54.8M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~177 days; expected demand during lead time 0.2.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 164.5M · order by 01 Oct 2026
Expected arrival ≈ 177 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.8%
stockout risk now 20%
Unit price
Rp 54.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 157 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 692.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-250D
PROPYLENE FAN
A100.57

Lead time and procurement

Lead time 177 ± 65 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jul 2025PR06
Regular replenishment
2Rp 54.8M24 Mar 2026256 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Apr 20261205000001292Other maintenance