IMPELLER,DWG.441-7853,FOR PP-362B
Material 4300069285 · IMPELLER · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4300069285
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 195 d · P80 280 d
- Unit price
- Rp 45.6M
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~195 days; expected demand during lead time 0.5.
- 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Long lead time: 80% of deliveries took up to 280 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 5
next delivery 20 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
98.7%
stockout risk now 0%
Unit price
Rp 45.6M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 186 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 178.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-362B FUEL OIL PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 195 ± 105 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 Aug 2026 | PR03 Regular replenishment | 2 | Rp 46.2M | 29 Apr 2027 open | 241 d |
| 12 Aug 2026 | PR06 Regular replenishment | 2 | Rp 44.9M | 20 Oct 2026 open | 69 d |
| 13 May 2026 | PR03 Regular replenishment | 1 | Rp 45.6M | 15 Mar 2027 open | 306 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Mar 2026 | 3 | 201000007321 | Corrective |