IMPELLER,DWG.441-7853,FOR PP-362B

Material 4300069285 · IMPELLER · Plant 1000

BLong-leadMonitorSlow-moving
Material
4300069285
Category
IMPELLER
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
195 d · P80 280 d
Unit price
Rp 45.6M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~195 days; expected demand during lead time 0.5.
  • 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Long lead time: 80% of deliveries took up to 280 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 5
next delivery 20 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
98.7%
stockout risk now 0%
Unit price
Rp 45.6M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 186 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 178.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-362B
FUEL OIL PUMP
B100.19

Lead time and procurement

Lead time 195 ± 105 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR03
Regular replenishment
2Rp 46.2M29 Apr 2027
open
241 d
12 Aug 2026PR06
Regular replenishment
2Rp 44.9M20 Oct 2026
open
69 d
13 May 2026PR03
Regular replenishment
1Rp 45.6M15 Mar 2027
open
306 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
29 Mar 20263201000007321Corrective