VALVE,GOVERNOR,DWG.398-6867,FOR KT-513
Material 4300069589 · VALVE · Plant 1000
ALong-leadReduceNon-moving
- Material
- 4300069589
- Category
- VALVE
- Base unit
- ASS
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI REFRAKTORI PRATAMA PT
- Lead time
- 63 d · P80 92 d
- Unit price
- Rp 306.9M
Recommendation
- 1.Forecast 0.1 ASS/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~63 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 5 exceeds the level to keep (0) by 5.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadConvert to Non StockSingle sourceOpen PO
On hand / on order
5 / 2
next delivery 07 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 306.9M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 26.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
Lead time and procurement
Lead time 63 ± 30 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Jul 2026 | PR03 Regular replenishment | 2 | Rp 306.9M | 07 Nov 2026 open | 110 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
Never issued in the 17-month history.