SEAL,LABYRINTH,DWG.367-8254,FOR KT-513
Material 4300069651 · SEAL · Plant 1000
AReduceNon-moving
- Material
- 4300069651
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- DUTA SEJAHTERA ABADI PT
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 70.9M
Recommendation
- 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~150 days; expected demand during lead time 0.0.
- 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 22 exceeds the level to keep (1) by 21.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
22 / 4
next delivery 10 Feb 2027
Today Min / Max
5 / 11
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.5%
stockout risk now 0%
Unit price
Rp 70.9M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 94.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 1 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-513 TURBINE FOR KC-513 | A | 2 | 2 | 1.53 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Nov 2025 | PR03 Regular replenishment | 2 | Rp 67.8M | 10 Feb 2027 open | 448 d |
| 17 Nov 2025 | PR05 Project / turnaround | 2 | Rp 73.9M | 19 Apr 2027 open | 518 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 03 May 2025 | Medium | PX_KT-513 | KT-513 governor valve hunting |
Recent goods issues
Never issued in the 17-month history.