Sparely
DU

BLADE,ROTOR,DWG.912-7135,FOR KT-513

Material 4300070474 · BLADE · Plant 1000

ALong-leadReduceNon-moving
Material
4300070474
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
DUTA SEJAHTERA ABADI PT
Lead time
193 d · P80 270 d
Unit price
Rp 887.9M

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~193 days; expected demand during lead time 0.0.
  • 3.A 96.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 19 exceeds the level to keep (1) by 18.
  • 5.Long lead time: 80% of deliveries took up to 270 days and the fastest seen in its category 99 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
19 / 5
next delivery 07 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
96.8%
stockout risk now 0%
Unit price
Rp 887.9M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 132.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~99 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53

Lead time and procurement

Lead time 193 ± 99 days (PO history, 4 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
22 Sept 2026PR06
Regular replenishment
1Rp 887.0M07 Mar 2027
open
166 d
19 Aug 2026PR03
Regular replenishment
2Rp 888.9M28 Apr 2027
open
252 d
05 Jun 2026PR03
Regular replenishment
2Rp 893.2M28 Mar 2027
open
296 d
16 May 2025PR06
Regular replenishment
1Rp 881.4M16 Aug 202592 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.