Sparely
DU

BLADE,ROTOR,DWG.673-8864,FOR KT-513

Material 4300070597 · BLADE · Plant 1000

AMonitorInsurance gap
Material
4300070597
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
181 d · P80 263 d
Unit price
Rp 381.5M (est.)

Recommendation

  • 1.Forecast 0.1 SET/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~181 days; expected demand during lead time 0.0.
  • 3.A 96.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
96.9%
stockout risk now 3%
Unit price
Rp 381.5M
Category + unit estimate
ML early warning: 0% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 132.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~99 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53

Lead time and procurement

Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.