POSITIONER,VALVE,DWG.200-9734,FOR LCV-10

Material 4300071518 · POSITIONER · Plant 1000

SMonitorNo stock needed
Material
4300071518
Category
POSITIONER
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
PERMATA INDUSTRI JAYA PT
Lead time
71 d · P80 166 d
Unit price
Rp 18.2M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~71 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 10%
Unit price
Rp 18.2M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 361 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~40 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1039
KC-318C LEVEL CONTROL
S130.55

Lead time and procurement

Lead time 71 ± 64 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
26 Aug 2026PR06
Regular replenishment
2Rp 18.0M10 Sept 202615 d
05 May 2026PR03
Regular replenishment
2Rp 18.3M01 Jul 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Aug 2026LowPX_LCV-1039Install scaffolding at LCV-1039
23 Sept 2025MediumPX_LCV-1039LCV-1039; small leak at packing
19 May 2025MediumPX_LCV-1039LCV-1039; small leak at packing

Recent goods issues

Posting dateQtyOrderOrder type
05 Oct 20251201000011009Corrective
27 Sept 20251201000003045Corrective