POSITIONER,VALVE,DWG.200-9734,FOR LCV-10
Material 4300071518 · POSITIONER · Plant 1000
SMonitorNo stock needed
- Material
- 4300071518
- Category
- POSITIONER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- PERMATA INDUSTRI JAYA PT
- Lead time
- 71 d · P80 166 d
- Unit price
- Rp 18.2M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~71 days; expected demand during lead time 0.1.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 10%
Unit price
Rp 18.2M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 361 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~40 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1039 KC-318C LEVEL CONTROL | S | 1 | 3 | 0.55 |
Lead time and procurement
Lead time 71 ± 64 days (PO history + category, 2 PO lines) · on-time 33%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Aug 2026 | PR06 Regular replenishment | 2 | Rp 18.0M | 10 Sept 2026 | 15 d |
| 05 May 2026 | PR03 Regular replenishment | 2 | Rp 18.3M | 01 Jul 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Low | PX_LCV-1039 | Install scaffolding at LCV-1039 |
| 23 Sept 2025 | Medium | PX_LCV-1039 | LCV-1039; small leak at packing |
| 19 May 2025 | Medium | PX_LCV-1039 | LCV-1039; small leak at packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Oct 2025 | 1 | 201000011009 | Corrective |
| 27 Sept 2025 | 1 | 201000003045 | Corrective |