Sparely
DU

POSITIONER,VALVE,DWG.484-1515,FOR FCV-16

Material 4300071882 · POSITIONER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300071882
Category
POSITIONER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
95 d · P80 166 d
Unit price
Rp 62.7M

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~95 days; expected demand during lead time 0.3.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 166 days and the fastest seen in its category 40 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 250.9M · order by 01 Oct 2026
Expected arrival ≈ 95 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.0%
stockout risk now 14%
Unit price
Rp 62.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 7 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 480.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~40 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1647
KC-636C OUTLET FLOW
A100.11

Lead time and procurement

Lead time 95 ± 64 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
17 Apr 2026PR06
Regular replenishment
1Rp 62.7M21 Jul 202695 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
24 Sept 20262201000017525Corrective