THERMOWELL,DWG.860-7559,FOR TEL-1476-15

Material 4300071911 · THERMOWELL · Plant 1000

BLong-leadReduceExcess
Material
4300071911
Category
THERMOWELL
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
73 d · P80 140 d
Unit price
Rp 11.3M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~73 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 72 exceeds the level to keep (2) by 70.
  • 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 43 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
72 / 1
next delivery 31 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 11.3M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 179 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 63.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~43 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1476-15
TEMPERATURE
B100.01

Lead time and procurement

Lead time 73 ± 40 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
19 Sept 2026PR06
Regular replenishment
1Rp 11.7M31 Oct 2026
open
42 d
16 Jul 2025PR03
Regular replenishment
2Rp 10.9M12 Oct 202588 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
05 Apr 20261205000032479Other maintenance