COUPLING,DWG.494-3994,FOR PP-1945B

Material 4300072684 · COUPLING · Plant 1000

ALong-leadReduceSlow-moving
Material
4300072684
Category
COUPLING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
81 d · P80 139 d
Unit price
Rp 2.7M

Recommendation

  • 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 10 exceeds the level to keep (3) by 7.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 44 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
10 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.7M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 255 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 582.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~44 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1945B
PROPYLENE PUMP
A141.47

Lead time and procurement

Lead time 81 ± 54 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
06 May 2026PR06
Regular replenishment
1Rp 2.8M14 Aug 2026100 d
08 Aug 2025PR06
Regular replenishment
1Rp 2.7M22 Sept 202545 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jan 2026LowPX_PP-1945BPP-1945B high vibration
28 Aug 2025LowPX_PP-1945BReplace lamp as per PM finding
13 Aug 2025LowPX_PP-1945BInstall scaffolding at PP-1945B
11 Aug 2025MediumPX_PP-1945BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
19 Jan 20261201000018559Corrective