TRIM SET,CONTROL VALVE,DWG.171-5197,FOR

Material 4300073491 · TRIM SET · Plant 1000

CMonitorNo stock needed
Material
4300073491
Category
TRIM SET
Base unit
SET
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
159 d · P80 236 d
Unit price
Rp 78.5M (est.)

Recommendation

  • 1.Forecast 3.1 SET/year: 3.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~159 days; expected demand during lead time 1.3.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 29%
Unit price
Rp 78.5M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~75 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-763A
SLOP OIL FLOW CONTROL
C151.82

Lead time and procurement

Lead time 159 ± 83 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_FCV-763AFCV-763A; valve hunting
29 Apr 2026MediumPX_FCV-763AFCV-763A; small leak at packing
25 Sept 2025MediumPX_FCV-763AFCV-763A passing
13 Sept 2025MediumPX_FCV-763AInstall scaffolding at FCV-763A
13 Jun 2025MediumPX_FCV-763APSM25/FCV-763A stuck

Recent goods issues

Posting dateQtyOrderOrder type
18 Sept 20253201000000848Corrective
17 Sept 20254201000000848Corrective
17 Sept 20251201000000848Corrective