SEAT RING,VALVE,DWG.529-9356,FOR PCV-149

Material 4300073505 · SEAT RING · Plant 1000

ALong-leadReorderCriticalStockout
Material
4300073505
Category
SEAT RING
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
LANGIT TEKNOLOGI PERSADA PT
Lead time
106 d · P80 117 d
Unit price
Rp 28.6M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~106 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 117 days and the fastest seen in its category 65 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 85.7M · order by 01 Oct 2026
Expected arrival ≈ 106 days
Long-leadLast turnaround used 1Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 13%
Unit price
Rp 28.6M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 39 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 679.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~65 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1496A
PP-821 PRESSURE CONTROL
A100.08

Lead time and procurement

Lead time 106 ± 41 days (PO history, 3 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jun 2026PR06
Regular replenishment
2Rp 27.9M29 Sept 2026110 d
05 Jan 2026PR06
Regular replenishment
2Rp 28.6M06 May 2026121 d
05 Dec 2025PR03
Regular replenishment
2Rp 29.2M17 Feb 202674 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Aug 20261201000025267Corrective
26 Dec 20251203000016277Turnaround